欧美激情成人在线-国产精品被窝福利一区-丰满少妇理论片bd高清-印度女人狂野牲交-成人久久免费-日韩免费福利视频-边喂奶边中出的人妻-久久精品人妻无码专区-久色视频在线-饥渴少妇色诱水电工-午夜精品久久久久久99热明星-97狠狠干-丰满尤物白嫩啪啪少妇

Track Record

Offshore Oil & Gas

Onshore Oil & Gas

Clean Energy

IMR & Decommissioning

Clean Energy

CNOOC GUANLAN

As China's first deep-sea floating wind power turbine platform, Guanlan has a capacity of 7.25 MW, an overall height of more than 200m and a total draft weight of 11,000 tons, with the water depth of 120m.

More

More

Enping 15-1 Oilfield Group Regional Development Project (CCUS)

The Enping 15-1 Oilfield Group joint development project has built four new platforms EP15-1CEP, EP20-4DPP, EP10-2WHPA, EP20-5WHPA, four new double-layer subsea pipelines with a total length of 100km, 57km new submarine/umbilical cables. It is also the first offshore carbon dioxide capture and storage project in China.

More

More

About Us

Offshore Oil Engineering Co., Ltd. is a listed company controlled by China National Offshore Oil Corporation. It is the only large general contracting company in China with capacities to undertake the design, procurement, construction, offshore installation, commissioning and maintenance of offshore oil and gas development projects, as well as the liquefied natural gas, offshore wind power, refining and chemical projects, etc. It is also one of the largest and the most competitive EPCI (engineering, procurement, construction and installation) contractors of offshore oil and gas projects in the Asia-Pacific region. The Company is headquartered in Binhai New Area, Tianjin. It was listed on Shanghai Stock Exchange (Stock Short Name: COOEC, Stock Symbol: 600583) on February 2002.

Follow us on WeChat

? Copyright ? Offshore Oil Engineering Corp CNOOC Ltd. Tianjin ICP NO.13005815-1 All Rights Reserved
主站蜘蛛池模板: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |